![harmonic filter design](https://enspecpower.com/wp-content/uploads/2020/11/harmonic-filter-design.jpg)
![P28 Assessment](https://enspecpower.com/wp-content/uploads/2020/07/1-1.jpg)
A P28 Assessment, UK Wind Farm
Assessing a UK Wind Farm connection against Engineering Recommendation P28.
![protection coordination](https://enspecpower.com/wp-content/uploads/2020/09/Protection-1.jpg)
A Protection Coordination Study, UK Manufacturing
A Protection Coordination study for a UK manufacturing plant.
![arc flash](https://enspecpower.com/wp-content/uploads/2020/10/1.jpg)
An Arc Flash Study, UK Manufacturing
A Protection Coordination study for a UK manufacturing plant.
![](https://enspecpower.com/wp-content/uploads/2022/02/Add-a-heading2.jpg)
Feasibility Study – NOA Stability Pathfinder Phase 2
Feasibility Study – NOA Stability Pathfinder Phase 2
![harmonic filter design](https://enspecpower.com/wp-content/uploads/2020/11/harmonic-filter-design.jpg)
Mitigating Voltage Interruptions for Kedrion Biopharma – Pharmaceutical Manufacturing
A 33kV Passive Harmonic Filter Design.
![rc snubber](https://enspecpower.com/wp-content/uploads/2020/03/Snubber-feature-web.jpg)
RC Snubber, Norway
Design and manufacture of a 33kV RC snubber for a shunt reactor in Norway.
![reactive compensation](https://enspecpower.com/wp-content/uploads/2020/04/Kype-Muir-front-view-web.jpg)
Reactive Power Compensation, Kype Muir Wind Farm
Dynamic Point-on-Wave reactive power compensation to satisfy grid code and provide transient free switching.
![](https://enspecpower.com/wp-content/uploads/2022/05/SPR-case-study2.png)
ScottishPower Renewables Maintenance Framework Agreement
3-year maintenance framework agreement to cover transformers, reactors and capacitors across 8 wind farms.
![Point-on-Wave switching](https://enspecpower.com/wp-content/uploads/2020/03/Kincardine-feature-web.jpg)
Shunt Reactor Switching with Point-on-Wave, Kincardine
Mitigating 33kV shunt reactor inrush currents and re-ignition with custom Point-on-Wave switching panels.
![SynchroTeq](https://enspecpower.com/wp-content/uploads/2020/03/Aikengall-main-web-3.jpg)
SynchroTeq Transformer Switching, Aikengall II Wind Farm
Ensuring P28 compliance for the sites 132kV, 90MVA grid transformer.
![Transformer P28 Compliance](https://enspecpower.com/wp-content/uploads/2020/05/Transformer-P28-3.jpg)
Transformer P28 Compliance, Cast Resin 11kV, Gang Operated CB
Transformer P28 compliance using Point-on-Wave switching on a 3-pole circuit breaker.