The Problem in Detail

Power factor correction equipment operates continuously in response to changing electrical demand. After fifteen years in service, a Q-VAr thyristor-switched PFC system at a major UK theme park was due for scheduled maintenance.

power quality surveys
shunt reactor switching

Finding the Solution

Enspec Power's Site Services engineers inspected the system to assess its condition and review its operational history.

The controller had recorded more than seven million switching operations since installation in 2011.

shunt reactor switching

Making it all Work

The inspection confirmed that the equipment continued to operate within its intended parameters, despite fifteen years of service and millions of switching operations.

power factor correction
reactive power compensation

What that means for the project now

The findings highlight the longevity of well-maintained electrical equipment and the value of planned inspections in supporting operational reliability and informing future maintenance decisions.

power factor correction uk theme park

15 years of power factor correction at a UK theme park

FREE DOWNLOAD

Send download link to:

Subscribe to get exclusive content and recommendations every month. You can unsubscribe anytime.