A P28 Assessment, UK Wind Farm
Assessing a UK Wind Farm connection against Engineering Recommendation P28.

A Protection Coordination Study, UK Manufacturing
A Protection Coordination study for a UK manufacturing plant.

An Arc Flash Study, UK Manufacturing
A Protection Coordination study for a UK manufacturing plant.


Earthing System Design: A Wind Farm Project
The Wind Farm Project required a thorough earthing system design to ensure electrical safety.

Feasibility Study – NOA Stability Pathfinder Phase 2
Feasibility Study – NOA Stability Pathfinder Phase 2

RC Snubber, Norway
Design and manufacture of a 33kV RC snubber for a shunt reactor in Norway.

Reactive Power Compensation, Kype Muir Wind Farm
Dynamic Point-on-Wave reactive power compensation to satisfy grid code and provide transient free switching.


ScottishPower Renewables Maintenance Framework Agreement
3-year maintenance framework agreement to cover transformers, reactors and capacitors across 8 wind farms.

Shunt Reactor Switching with Point-on-Wave, Kincardine
Mitigating 33kV shunt reactor inrush currents and re-ignition with custom Point-on-Wave switching panels.

SynchroTeq Transformer Switching, Aikengall II Wind Farm
Ensuring P28 compliance for the sites 132kV, 90MVA grid transformer.

Transformer P28 Compliance, Cast Resin 11kV, Gang Operated CB
Transformer P28 compliance using Point-on-Wave switching on a 3-pole circuit breaker.