Point-on-Wave Switching at Viking Wind Farm

Ensuring compliance and stability for a 443 MW wind farm

Enspec power

The Problem in Detail

Connecting the Viking Wind Farm to the Shetland grid came with unique challenges. The network’s weak grid conditions made it highly sensitive to voltage dips, while strict compliance requirements meant even the smallest fluctuation had to be managed. Add in transformer energisation risks and site-wide instability, and it was clear a standard approach wouldn’t work.

shunt reactor switching

Finding the Solution

Our team carried out extensive studies and on-site testing to design a commissioning method that could reduce transformer inrush currents and maintain stability. Every option was carefully analysed to ensure compliance while protecting equipment and supporting long-term reliability.

shunt reactor switching

Results

Through detailed planning and precise execution, we successfully reduced inrush currents, kept all energisations within compliance thresholds, and created a repeatable process that operators could rely on. Remote access to key devices was also enabled, providing flexibility and security for future operations.

reactive power compensation

What that means for the project

The Viking Wind Farm achieved a reliable, grid-compliant connection despite some of the most complex energisation conditions in the UK. The project not only safeguarded operations but also provided a blueprint for managing similar challenges in future renewable energy projects.

 