Lightning Risk Assessment for a 33kV Wind Farm Switchroom in Accordance with BS EN 62305-2

Enspec power

The Problem in Detail

A Lightning Risk Assessment was required for a 132kV and 33kV substations of a UK wind farm to determine whether additional lightning protection measures were necessary under
BS EN 62305-2.

shunt reactor switching

Finding the Solution

A zone-based assessment was carried out, modelling direct strike (AD) and indirect influence (AM) areas and comparing calculated risk levels against the standard’s tolerable thresholds.

shunt reactor switching

Results

Calculated risks of loss and damage were below tolerable limits, confirming that no additional Lightning Protection System or surge mitigation upgrades were required.

reactive power compensation

What that means for the project

The developer achieved full compliance without unnecessary protection measures or added capital cost.

 

Lightning Risk Assessment for a Wind Farm 33kV Switchroom

FREE DOWNLOAD

Send download link to:

Subscribe to get exclusive content and recommendations every month. You can unsubscribe anytime.