{"id":2824,"date":"2023-04-17T12:38:41","date_gmt":"2023-04-17T11:38:41","guid":{"rendered":"https:\/\/www.enspecpower.com\/?p=2824"},"modified":"2025-08-20T10:31:26","modified_gmt":"2025-08-20T09:31:26","slug":"point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm","status":"publish","type":"post","link":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/","title":{"rendered":"Point-on-Wave technology key in providing grid code compliant solution &#8211; Fallago Rig Wind Farm"},"content":{"rendered":"<p>Looking back at a project completed close to a year ago now, it&#8217;s important to highlight key innovations and the improvement it can have on the net-zero transition, as well as the overall operations of Wind Farms across the country.<\/p>\n<p>Last year Enspec completed a successful power system project at the Fallago Rig Wind Farm, operated by EDF Renewables UK with 80% assets owned by Hermes Infrastructure.<\/p>\n<p>Enspec&#8217;s uniquely designed switching panel uses <a href=\"https:\/\/www.enspecpower.com\/point-on-wave-switching\/\">Point-on-Wave<\/a> technology to manage a very complex switching and control requirement that will give Fallago Rig the most cost-effective solution to the site\u2019s voltage control requirements. Fallago Rig was already a fully operational wind farm and included a full STATCOM system, which were historically commonly used for UK grid code compliance in wind farms. The original STATCOM cost several million pounds and has worked very hard to support the transmission network voltage since day one of operation. Whilst Obligatory Reactive Power Service (ORPS) payments were accordingly high, inverter failure rates and associated costs were increasing, and enduring support and risk of non-compliance became more of a concern.<\/p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_2814\" style=\"width: 1034px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2814\" class=\"wp-image-2814 size-large\" src=\"https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/FallagoRig_191-1024x683.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/FallagoRig_191-1024x683.jpg 1024w, https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/FallagoRig_191-300x200.jpg 300w, https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/FallagoRig_191-768x512.jpg 768w, https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/FallagoRig_191-1536x1024.jpg 1536w, https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/FallagoRig_191-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><p id=\"caption-attachment-2814\" class=\"wp-caption-text\">Fallago Rig Wind Farm<br \/>Pic: Peter Devlin<\/p><\/div>\n<p>To solve this issue, ensuring power quality and compliance, Enspec manufactured and commissioned 50MVAr of PoW switched capacitor banks, as part of a hybrid solution, which cost \u00a31.6mil versus another estimated \u00a35.1mil for a new STATCOM system. Enspec&#8217;s Point-on-Wave (PoW) system also has nowhere near the maintenance cost, saving EDF \u00a3100,000s annually.<\/p>\n<p>&nbsp;<\/p>\n<blockquote><p>\u201cWe\u2019ve been incredibly impressed with Enspec\u2019s expertise in not only providing the P-o-W switched capacitor element of the hybrid solution, but also their capacity to identify and mitigate risks associated with adding and switching large capacitor banks onto an existing electrical system in such a manner,\u201d said Rob Mitchell, Senior Electrical Engineer at EDF Renewables.<\/p><\/blockquote>\n<p>&nbsp;<\/p>\n<p>The solution features Enspec&#8217;s expertise in Point-on-Wave (PoW) switching to allow for capacitor bank re-energisations within seconds instead of the traditional 8-10 minutes. The PoW banks will then work in conjunction with the upgraded control software of the Vestas turbines and wind farm controller in a hybrid solution to provide dynamic voltage control in line with Grid Code requirements.\u201d.<\/p>\n<div id=\"attachment_2816\" style=\"width: 1034px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2816\" class=\"wp-image-2816 size-large\" src=\"https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/FallagoRig_350-1024x683.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/FallagoRig_350-1024x683.jpg 1024w, https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/FallagoRig_350-300x200.jpg 300w, https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/FallagoRig_350-768x512.jpg 768w, https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/FallagoRig_350-1536x1024.jpg 1536w, https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/FallagoRig_350-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><p id=\"caption-attachment-2816\" class=\"wp-caption-text\">Fallago Rig Wind Farm<br \/>Pic: Peter Devlin<\/p><\/div>\n<p>The capacitor banks also offers greatly reduced transients on energisations; where traditional capacitor banks can pull 1000s of Amps of inrush current, PoW banks are energised with inrush current levels only 1.5-2 times higher than the standard capacitor bank rating. This reduces wear on switches and ensures for limited disturbances on the Wind Farm network.<\/p>\n<p>&nbsp;<\/p>\n<p>Enspec applied their established and trusted knowledge in harmonic studies and compliance by carrying out a revised G5\/4 harmonic study for the Wind Farm with consideration of the new capacitor banks. This highlighted that normal banks could lead to harmonic resonance and amplification and so guided the design towards a de-tuned type to avoid this phenomenon.<\/p>\n<p>&nbsp;<\/p>\n<p>The newly installed voltage support system was confirmed to fully satisfy all criteria. Enspec director, Tim Rastall, said; \u201cEnspec is very grateful for the trust of our long-standing partner EDF Renewables to deliver this significant project for Fallago Rig. We are very proud of our team\u2019s dedication and effort towards the completion of this milestone contract. It is great to see the completed system in operation and delivering the designed grid code compliance support.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p><em>All images have been provided by EDF Renewables. <\/em><\/p>\n<p><strong>About Fallago Rig wind farm<\/strong><\/p>\n<p>Fallago Rig wind farm is situated in Lammermuir Hills in Berwickshire, Scotland. It consists of 48 3MW turbines, with a generating capacity of 144MW. The construction of Fallago Rig, which was commissioned in 2013, saw \u00a33 million invested into the local community and created more than 350 jobs. \u00a3240,000 is invested into the community on an annual basis via the wind farm\u2019s community benefit fund.<\/p>\n<p>For more information, go to the Fallago Rig Wind Farm website : <a href=\"https:\/\/www.edf-re.uk\/our-sites\/fallago-rig\">https:\/\/www.edf-re.uk\/our-sites\/fallago-rig<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><strong>About EDF Renewables in the United Kingdom<\/strong><\/p>\n<p>EDF Renewables UK and Ireland (www.edf-re.uk) is a subsidiary of the EDF Group, one of the world\u2019s largest low carbon electricity companies, and our investment and innovation is reducing costs for consumers and bringing significant benefits for communities. With our operating portfolio of 36 renewable energy sites including battery, onshore and offshore wind (together totalling 1 GW) we are providing much needed affordable, low carbon electricity. We have an expanding portfolio with almost 5 GW of projects in planning and development, including wind, battery and solar PV. Find out more at <a href=\"https:\/\/www.edf-re.uk\/\">www.edf-re.uk<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><strong>About Hermes Infrastructure<\/strong><\/p>\n<p>Federated Hermes Infrastructure is part of Federated Hermes Limited\u2019s Private Markets Platform, comprising Infrastructure, Real Estate, Private Equity and Private Credit, with an aggregate AUM of c.\u00a320bn USD as at 31 March 2022.\u00a0 Our infrastructure team manages a \u00a33.1 billion portfolio of infrastructure investments in the UK and Europe, across renewable energy, regulated utilities and transport infrastructure sectors. On behalf of our &gt;1m UK and European pension beneficiaries, we are focussed on investing in long-term, sustainable infrastructure which provides value to all stakeholders. For more information please visit:\u00a0<a href=\"https:\/\/secure-web.cisco.com\/1ybl8versPyng4pVo7F7_b7gKQa3n37pCTkQvtB2IunTzQre2Pd4NuuWTAWO0l_K9BzKpyYQzoHmaewrPiFsombMG51NsUyka_T2fh-UWf_T7iX_Mb9HtkEclGzxxrWCn5zL0O-FU4ngXjfjNl6f0UFE43e7Gd9s5b1XEYv1cVsnwGMS670JPvL_yZg7n4tjPgyzCpgOQsXlSpQE-gFHlMNQqF025yCjF5xv7DlJq-smVVexYjDeCmMq9c_nssD0JnQ-zSAabZy1A_Na-vvO7oOVuZmaw9HNDCAbi9B7JbYCsQ74oA_3vMAiOsYOP8_-PQ8wcdCqUXrg_IWMUAC9yax9kmsuHbYfGm4d5YuknN6jny9yoeM1xqwU8qXETFLjw_yLe9wIpUlhZNngGV8ZjSOLH4wdVGHOhdl0fLMsQQ_UIAGH3wJBqURaTgK4mf1ms6fERJSt4FRh5XjeP5OxpibXJQrBpMiGwHLFPTBkdSY3MvivVD5AA954h66yZsIgC\/https%3A%2F%2Fwww.hermesgpeinfrastructure.com%2F\">Hermes Infrastructure (hermesgpeinfrastructure.com)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Looking back at a project completed close to a year ago now, it&#8217;s important to highlight key innovations and the improvement it can have on the net-zero transition, as well as the overall operations of Wind Farms across the country. Last year Enspec completed a successful power system project at the Fallago Rig Wind Farm, &#8230;<\/p>\n","protected":false},"author":8,"featured_media":2821,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[80],"tags":[120,121,122,123,124],"class_list":["post-2824","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-enspec-news-en-usa","tag-capacitor-bank-en-usa","tag-point-on-wave-en-usa","tag-sctoland-en-usa","tag-statcom-en-usa","tag-wind-farm-en-usa"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Grid Code Compliance via Point-on-Wave \u2013 Fallago Rig | Enspec<\/title>\n<meta name=\"description\" content=\"Point-on-Wave technology key in providing grid code compliant solution and replacing STATCOM system. Fallago Rig Wind Farm, Scotland.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Grid Code Compliance via Point-on-Wave \u2013 Fallago Rig | Enspec\" \/>\n<meta property=\"og:description\" content=\"Point-on-Wave technology key in providing grid code compliant solution and replacing STATCOM system. Fallago Rig Wind Farm, Scotland.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/\" \/>\n<meta property=\"og:site_name\" content=\"Enspec Power\" \/>\n<meta property=\"article:published_time\" content=\"2023-04-17T11:38:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-20T09:31:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/headers12-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Mara Rastall\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mara Rastall\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/\"},\"author\":{\"name\":\"Mara Rastall\",\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/#\\\/schema\\\/person\\\/4a9e626aa9724a8eb39d4f69b1cf0e38\"},\"headline\":\"Point-on-Wave technology key in providing grid code compliant solution &#8211; Fallago Rig Wind Farm\",\"datePublished\":\"2023-04-17T11:38:41+00:00\",\"dateModified\":\"2025-08-20T09:31:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/\"},\"wordCount\":873,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/enspecpower.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/headers12-e1729332750840.png\",\"keywords\":[\"capacitor bank\",\"point on wave\",\"sctoland\",\"STATCOM\",\"wind farm\"],\"articleSection\":[\"Enspec news\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/\",\"url\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/\",\"name\":\"Grid Code Compliance via Point-on-Wave \u2013 Fallago Rig | Enspec\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/enspecpower.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/headers12-e1729332750840.png\",\"datePublished\":\"2023-04-17T11:38:41+00:00\",\"dateModified\":\"2025-08-20T09:31:26+00:00\",\"description\":\"Point-on-Wave technology key in providing grid code compliant solution and replacing STATCOM system. Fallago Rig Wind Farm, Scotland.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/#primaryimage\",\"url\":\"https:\\\/\\\/enspecpower.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/headers12-e1729332750840.png\",\"contentUrl\":\"https:\\\/\\\/enspecpower.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/headers12-e1729332750840.png\",\"width\":1500,\"height\":1000},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Point-on-Wave technology key in providing grid code compliant solution &#8211; Fallago Rig Wind Farm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/#website\",\"url\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/\",\"name\":\"Enspec Power\",\"description\":\"Electrical Engineering Company and Power Quality Experts\",\"publisher\":{\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/#organization\",\"name\":\"Enspec Power Ltd\",\"url\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/enspecpower.com\\\/wp-content\\\/uploads\\\/2020\\\/03\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/enspecpower.com\\\/wp-content\\\/uploads\\\/2020\\\/03\\\/logo.svg\",\"width\":39,\"height\":18,\"caption\":\"Enspec Power Ltd\"},\"image\":{\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/enspec-power-ltd\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/enspecpower.com\\\/en-usa\\\/#\\\/schema\\\/person\\\/4a9e626aa9724a8eb39d4f69b1cf0e38\",\"name\":\"Mara Rastall\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f9c4d9823eeb6fbaf85187ee7f31260855b95319951c8b026782b652bac809b8?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f9c4d9823eeb6fbaf85187ee7f31260855b95319951c8b026782b652bac809b8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f9c4d9823eeb6fbaf85187ee7f31260855b95319951c8b026782b652bac809b8?s=96&d=mm&r=g\",\"caption\":\"Mara Rastall\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Grid Code Compliance via Point-on-Wave \u2013 Fallago Rig | Enspec","description":"Point-on-Wave technology key in providing grid code compliant solution and replacing STATCOM system. Fallago Rig Wind Farm, Scotland.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/","og_locale":"en_US","og_type":"article","og_title":"Grid Code Compliance via Point-on-Wave \u2013 Fallago Rig | Enspec","og_description":"Point-on-Wave technology key in providing grid code compliant solution and replacing STATCOM system. Fallago Rig Wind Farm, Scotland.","og_url":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/","og_site_name":"Enspec Power","article_published_time":"2023-04-17T11:38:41+00:00","article_modified_time":"2025-08-20T09:31:26+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/headers12-1024x683.png","type":"image\/png"}],"author":"Mara Rastall","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Mara Rastall","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/#article","isPartOf":{"@id":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/"},"author":{"name":"Mara Rastall","@id":"https:\/\/enspecpower.com\/en-usa\/#\/schema\/person\/4a9e626aa9724a8eb39d4f69b1cf0e38"},"headline":"Point-on-Wave technology key in providing grid code compliant solution &#8211; Fallago Rig Wind Farm","datePublished":"2023-04-17T11:38:41+00:00","dateModified":"2025-08-20T09:31:26+00:00","mainEntityOfPage":{"@id":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/"},"wordCount":873,"commentCount":0,"publisher":{"@id":"https:\/\/enspecpower.com\/en-usa\/#organization"},"image":{"@id":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/#primaryimage"},"thumbnailUrl":"https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/headers12-e1729332750840.png","keywords":["capacitor bank","point on wave","sctoland","STATCOM","wind farm"],"articleSection":["Enspec news"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/","url":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/","name":"Grid Code Compliance via Point-on-Wave \u2013 Fallago Rig | Enspec","isPartOf":{"@id":"https:\/\/enspecpower.com\/en-usa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/#primaryimage"},"image":{"@id":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/#primaryimage"},"thumbnailUrl":"https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/headers12-e1729332750840.png","datePublished":"2023-04-17T11:38:41+00:00","dateModified":"2025-08-20T09:31:26+00:00","description":"Point-on-Wave technology key in providing grid code compliant solution and replacing STATCOM system. Fallago Rig Wind Farm, Scotland.","breadcrumb":{"@id":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/#primaryimage","url":"https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/headers12-e1729332750840.png","contentUrl":"https:\/\/enspecpower.com\/wp-content\/uploads\/2023\/04\/headers12-e1729332750840.png","width":1500,"height":1000},{"@type":"BreadcrumbList","@id":"https:\/\/enspecpower.com\/en-usa\/point-on-wave-technology-key-in-providing-grid-code-compliant-solution-fallago-rig-wind-farm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enspecpower.com\/en-usa\/"},{"@type":"ListItem","position":2,"name":"Point-on-Wave technology key in providing grid code compliant solution &#8211; Fallago Rig Wind Farm"}]},{"@type":"WebSite","@id":"https:\/\/enspecpower.com\/en-usa\/#website","url":"https:\/\/enspecpower.com\/en-usa\/","name":"Enspec Power","description":"Electrical Engineering Company and Power Quality Experts","publisher":{"@id":"https:\/\/enspecpower.com\/en-usa\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enspecpower.com\/en-usa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enspecpower.com\/en-usa\/#organization","name":"Enspec Power Ltd","url":"https:\/\/enspecpower.com\/en-usa\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enspecpower.com\/en-usa\/#\/schema\/logo\/image\/","url":"https:\/\/enspecpower.com\/wp-content\/uploads\/2020\/03\/logo.svg","contentUrl":"https:\/\/enspecpower.com\/wp-content\/uploads\/2020\/03\/logo.svg","width":39,"height":18,"caption":"Enspec Power Ltd"},"image":{"@id":"https:\/\/enspecpower.com\/en-usa\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/enspec-power-ltd"]},{"@type":"Person","@id":"https:\/\/enspecpower.com\/en-usa\/#\/schema\/person\/4a9e626aa9724a8eb39d4f69b1cf0e38","name":"Mara Rastall","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f9c4d9823eeb6fbaf85187ee7f31260855b95319951c8b026782b652bac809b8?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f9c4d9823eeb6fbaf85187ee7f31260855b95319951c8b026782b652bac809b8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f9c4d9823eeb6fbaf85187ee7f31260855b95319951c8b026782b652bac809b8?s=96&d=mm&r=g","caption":"Mara Rastall"}}]}},"_links":{"self":[{"href":"https:\/\/enspecpower.com\/en-usa\/wp-json\/wp\/v2\/posts\/2824","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enspecpower.com\/en-usa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enspecpower.com\/en-usa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enspecpower.com\/en-usa\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/enspecpower.com\/en-usa\/wp-json\/wp\/v2\/comments?post=2824"}],"version-history":[{"count":2,"href":"https:\/\/enspecpower.com\/en-usa\/wp-json\/wp\/v2\/posts\/2824\/revisions"}],"predecessor-version":[{"id":7468,"href":"https:\/\/enspecpower.com\/en-usa\/wp-json\/wp\/v2\/posts\/2824\/revisions\/7468"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enspecpower.com\/en-usa\/wp-json\/wp\/v2\/media\/2821"}],"wp:attachment":[{"href":"https:\/\/enspecpower.com\/en-usa\/wp-json\/wp\/v2\/media?parent=2824"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enspecpower.com\/en-usa\/wp-json\/wp\/v2\/categories?post=2824"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enspecpower.com\/en-usa\/wp-json\/wp\/v2\/tags?post=2824"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}