Enspec system selected for Ovenden Moor Wind Farm

Posted by: Sarah
Article's Image

Enspec has been chosen to provide a C-VAr® system at Ovenden Moor Wind Farm near Halifax.
Operational since 1993, Ovenden Moor is a long-established wind farm using 23 turbines to generate 9.2MW of power. The site is currently undergoing a major refurbishment project that will see the old turbines replaced by 9 much larger turbines to increase output to 18MW. Enspec has been selected by Balance of Plant contractors Athena Professional Technical Services Limited to supply a C-VAr biasing capacitor bank system.
Work at the site will be completed in 2016.

Categories: